Case Studies

Selected projects from 1000+ deployments.

A snapshot of how we have helped enterprises consolidate vendors, modernise infrastructure and improve operational visibility — across industries and geographies.

(Examples are anonymised for confidentiality. Customer-approved stories can be added once shared.)

Corporate Enterprise
Pune
850 employees · 4 floors · 1 lobby
Access ControlCCTVBiometric AttendanceHRMS Integration

Integrated access, attendance & surveillance for a 4-floor corporate HQ

Challenge

Multiple legacy vendors for security, attendance and visitor management with no unified reporting and rising AMC overheads.

Approach

Consolidated to a single-stack solution — flap-barrier lobby, face-recognition terminals at floor entries, networked NVR with VMS, and Protea HRMS integration for live headcount.

Outcomes
  • 40% fewer vendor touchpoints
  • Unified attendance & visitor reporting
  • SLA-driven AMC for hardware + software
Manufacturing
12 sites across India
6,500 workers · 3 shifts · contractor-heavy
Biometric AttendanceBoom BarriersCCTVAMC

PAN-India biometric attendance roll-out across 12 plants

Challenge

Manual attendance, contractor mismatches and disjointed shift reports across plants caused payroll disputes and audit findings.

Approach

Rolled out face + finger hybrid terminals at every gate, integrated with central HRMS over MPLS/SD-WAN, and added boom barriers + ANPR for vehicle in/out logs.

Outcomes
  • Single source of truth for attendance
  • Zero contractor headcount mismatch in audits
  • 24×7 SLA-driven service across all 12 sites
BFSI
60 branches
60 branches · 400+ cameras · 1 NOC
CCTVNVR & VMSNetworkingEndpoint Security

Branch surveillance and centralised VMS for a regional bank

Challenge

Branch-level DVRs with inconsistent retention, no central viewing, and frequent storage failures impacting compliance.

Approach

Standardised on IP cameras with PoE switches, deployed a central VMS at the NOC with redundancy, and added health monitoring + alerts.

Outcomes
  • Centralised, 90-day compliant retention
  • Live health-status dashboards at NOC
  • Reduced incident response from days to hours
Education
Maharashtra
6,200 students · 18 buildings
Biometric AttendanceNetworking (Wi-Fi)CCTVIT Infrastructure

Campus-wide biometric attendance and Wi-Fi for an engineering institute

Challenge

Paper-based attendance, patchy Wi-Fi between blocks and aging surveillance hardware.

Approach

Deployed face-recognition terminals at every classroom entry, structured cabling backbone + Wi-Fi 6 APs across all buildings, and replaced surveillance with IP CCTV.

Outcomes
  • Real-time class attendance for faculty & parents
  • Seamless campus Wi-Fi roaming
  • Compliance-ready CCTV retention
Healthcare
Pune
600 beds · 8 restricted zones · 24×7 operations
Access ControlCCTVHRMSAMC

Restricted-zone access control for a 600-bed multi-block hospital

Challenge

Manual key-based control over critical zones (ICU, OT, pharmacy, NICU) with no audit trail and inconsistent compliance.

Approach

Deployed card + biometric access at 8 restricted zones with anti-passback and audit logging; integrated with HRMS for staff roles and shift mapping.

Outcomes
  • Full audit trail for restricted-zone access
  • Role-based access mapped to HR shift roster
  • NABH-aligned compliance evidence
Government
Tier-2 city, Maharashtra
180+ city locations · 1 NOC · 24×7
CCTV (PTZ + fixed)VMSVideo WallNetworking

City-level surveillance command centre with video walls

Challenge

Distributed CCTV deployments with no centralised viewing for the municipality, hampering investigation and response.

Approach

Deployed VMS-based command centre with multi-screen video wall, integrated 180+ city camera locations, and added health monitoring + structured incident logging.

Outcomes
  • Single command-centre view across the city
  • Faster incident response coordination
  • Audit-ready archive with 90-day retention
Ready to plan your next system?

Have a similar project in mind?

Share your scope and we will return a vendor-neutral solution design, BOQ and rollout plan within 5 business days.